by Kheeran Offshore Technical Team Kheeran Offshore Technical Team

Documenting Load, Hold Time and Movement During Pull Tests focuses on one defined technical question. A traceable record should connect the anchor location, fixture, instrument, applied load, duration, observed movement and final status.

Pull testing should begin with an agreed load, hold time, reaction arrangement and acceptance rule. The report must distinguish a proof test from a test to failure and identify the exact anchor or location tested.

The Kheeran Offshore pull test service gives contractors and operators across Guyana certified proof that anchors, fixings, and lifting points can safely carry their rated loads. From a single eyebolt to hundreds of scaffold ties, our technicians test on your site with calibrated equipment and issue certificates the same week.

Kheeran Offshore pull test being performed on site in Guyana

What the Kheeran Offshore Pull Test Covers

  • Anchor bolts and chemical (resin) anchors in concrete and masonry
  • Scaffold ties, eyebolts, and fall-protection anchors
  • Lifting points, padeyes, and runway beams
  • Handrails, barriers, and facade fixings
  • Proof load tests to project-specific or manufacturer values

How Our Pull Test Works

First, we agree the test load, standard, and sample rate with your engineer, following BS 8539 and ASTM practice. On site, a calibrated hydraulic tester applies the load gradually while displacement is monitored. Anchors that hold the proof load without movement pass; results are recorded, tagged, and compiled into a certificate pack your client and auditors can rely on.

Why Contractors Choose the Kheeran Offshore Pull Test

We are a Guyana-based testing and inspection company with deep oil and gas, marine, and construction experience. That means fast mobilisation from Providence and Georgetown, technicians who understand live site constraints, and reports engineered for international acceptance. Combined with our anchor pull test and NDT services, one call covers your whole verification scope.

Typical Projects

Recent work includes scaffold tie verification for shore-base construction, padeye proof loading for fabrication yards, fall-arrest anchor certification for tank maintenance, and barrier fixing tests for public infrastructure. Every Kheeran Offshore pull test is planned so production is not interrupted.

Book a Pull Test Today

Call +592-602-5664 or email admin@kheeran.gy for pricing and availability. The Kheeran Offshore pull test team provides free quotations, method statements, and certificates accepted across Guyana, Suriname, and the Caribbean.